top of page

Projects

• KAZAKHSTAN ALMATY, KASKELEN SULEYMAN DEMIREL UNIVERSITY, WATER WELL DRILLING PURPOSES STUDIES

Total Drill Quantity: 320 meters

 

• KAZAKHSTAN ALMATY, AKYAR STUDENT HOSTEL, WATER WELL DRILLING PURPOSES STUDIES

Total Drill Quantity: 400 meters

 

• KAZAKHSTAN ALMATY, TALGAR DAIRY PRODUCTS FACTORY, USING WATER WELL DRILLING STUDIES

Total Drill Quantity: 560 meters

 

• ANKARA KIZILCAHAMAM, ASYA MINOR MINING, USING WATER WELL DRILLING STUDIES

Total Drill Quantity: 495 meters

 

• MANISA EROGLU DAM, RESERVOIR AREA IN THE REMAINING WATER WELL RE-OPENING STUDIES

Total Drill Quantity: 300 meters

bottom of page