top of page

Projects

#1

• SAKARYA DOGANCAY, REGULATOR AND HYDROELECTRIC POWER PLANT - II, GROUT IMPROVEMENT WORKS AND CONSTRUCTION GEOTECHNICAL GROUTING STUDIES

• SAKARYA DOGANCAY, REGULATOR AND HYDROELECTRIC POWER PLANT -I, GROUT IMPROVEMENT WORKS AND CONSTRUCTION GEOTECHNICAL GROUTING STUDIES  

• AFYON SUHUT, SEHIT UZMAN CAVUS NURULLAH OYMAK DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES

• SIVAS SARKISLA KARACAOREN DAM, RIGHT COAST AND CUT – OFF GEOTECHNICAL GROUTING STUDIES

• SIVAS TUTMAC DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES

• SIVAS KARASAR DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES

• AFYON SANDIKLI KOCAGAZI DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES

• GIRESUN CALIKOBASI, REGULATOR AND HYDROELECTRIC POWER PLANT, GROUT IMPROVEMENT WORKS AND CONSTRUCTION GEOTECHNICAL GROUTING STUDIES

• KONYA MEDOVA HOSPITAL, GEOTECHNICAL GROUTING STUDIES

• ISTANBUL METRO, INSIDE TUNNEL UPPER FASE  PST-M GROUT IMPROVEMENT STUDIES 

 

• BALIKESIR BAYAT SEHIT AYDIN NAZILLIOGLU DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES

• BOLU YENICAGA CENTRAL MOSQUE , JET GROUTING STUDIES

• ANKARA BEYPAZARI GURSOGUT HEPP  DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES

• MANISA DEMIRCI AYVAALANI  DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES

• MERSIN TOROSLAR GOZNE  DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES

• KUTAHYA SAPHANE DAM, CUT-OFF GROUTING STUDIES 2014

 

• SAKARYA GEYVE DEREKOY, UNDERPASS CONSOLIDATION GEOTECHNICAL GROUTING STUDIES

 

• KUTAHYA GEDIZ YAGMURLAR DAM, CUT-OFF GEOTECHNICAL GROUTING STUDIES

 

• AFYON IHSANİYE SARICAOVA DAM, CUT-OFF GEOTECHNICAL GROUTING STUDIES

 

• MANISA DEMIRCI AYVAALANI DAM, CUT-OFF CONSOLIDATION GEOTECHNICAL GROUTING STUDIES

 

• DENIZLI GUNEY KOPARAN DAM, INTAKE STRUCTURE ANCHOR GEOTECHNICAL GROUTING STUDIES

 

• SAMSUN 19 MAY DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES

• AYDIN KARACASU DAM, SPILLWAY GEOTECHNICAL GROUTING STUDIES

• AFGHANISTAN FAIZABAD DAM,  GEOTECHNICAL GROUTING STUDIES

• KUZEY MARMARA HIGHWAY, INTER CONNECTION WAYS, INSIDE TUNNEL GEOTECHNICAL GROUTING STUDIES

• BALIKESIR BALYA KAYAPINAR DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES

• KONYA HUYUK ILMEN DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES

• NIGDE BOR HALAC DAM, CUT – OFF GEOTECHNICAL JET GROUTING STUDIES

•  KARAMAN MERKEZ YILANGOMU DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES

• KUTAHYA GEDIZ YAGMURLAR DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES

• DENIZLI GUNEY KOPARAN DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES

#2

• ARTVIN DERINKOY HIZARLI , MINERAL EXPLORATION CORE DRILLS (GOLD)

Max Drill Height : 800 meters

1. Stage : Total Drill Quantity: 1,605 meters

2. Stage : Total Drill Quantity: 1,100 meters

 

• CANAKKALE BAYRAMIC, MINERAL EXPLORATION CORE DRILLS (GOLD)

Max Drill Height: 700 meters

Total Drill Quantity: 3030 meters

 

• SIIRT MADENKOY MINERAL EXPLORATION CORE DRILLS (COPPER)

Max Drill Height: 810 meters

Total Drill Quantity: 2,180 meters

 

• KASTAMONU HANONU, MINERAL EXPLORATION CORE DRILLS (COPPER)

Max Drill Height: 600 meters

Total Drill Quantity: 4,400 meters

• CANAKKALE BAYRAMIC, MINERAL EXPLORATION CORE DRILLS (GOLD)

Max Drill Height: 400 meters

Total Drill Quantity: 3,030 meters

• CANAKKALE BAYRAMIC PITIRELI, MINERAL EXPLORATION CORE DRILLS (ZINC)

Max Drill Height: 220 meters

Total Drill Quantity: 900 meters

• ADANA ALADAG, MINERAL EXPLORATION CORE DRILLS (CHROMIUM)

Max Drill Height: 200 meters

Total Drill Quantity: 1,500 meters

• CANAKKALE BIGA, MINERAL EXPLORATION CORE DRILLS (LEAD, COPPER, ZINC, SILVER)

Max Drill Height: 450 meters

Total Drill Quantity: 2,000 meters

• KUTAHYA TAVSANLI SAPCI, MINERAL EXPLORATION CORE DRILLS (COAL)

Max Drill Height : 405 meters

Total Drill Quantity : 2060 meters

 

• KÜTAHYA TAVSANLI SAPCI DEDE, MINERAL EXPLORATION CORE DRILLS (COAL)

Max Drill Height: 540 meters

Total Drill Quantity: 1100 meters

 

• BURDUR KARAMANLI,  MINERAL EXPLORATION CORE DRILLS (MARBLE)

Max Drill Height: 60 meters

Total Drill Quantity: 400 meters

• MUGLA KOYCEGIZ-MENTESE, MINERAL EXPLORATION CORE DRILLS (CHROMIUM)

Max Drill Height: 350 meters

Total Drill Quantity: 5,000 meters

• BURSA ORHANELI, MINERAL EXPLORATION CORE DRILLS (CHROMIUM)

Max Drill Height: 280 meters

Total Drill Quantity: 3,500 meters

• GAZIANTEP NURDAGI, MINERAL EXPLORATION CORE DRILLS (CHROMIUM)

Max Drill Height: 200 meters

Total Drill Quantity: 3,500 meters

• MERSIN ERDEMLI, MINERAL EXPLORATION CORE DRILLS (CHROMIUM)

Max Drill Height: 110 meters

Total Drill Quantity: 1,500 meters

#3

• AFGHANISTAN FAIZABAD, REGULATOR AND HYDROELECTRIC POWER PLANT GEOTECHNICAL CONSULTING STUDIES

 

• CANKAYA KARATAS LOCATION, 1094 PARCELS COMPLETION OF CONSTRUCTION AND MUNICIPAL AFFAIRS OFFICE FACILITIES GEOTECHNICAL REPORTS STUDIES 

• AYDIN KARACASU DAM, RAISING THE DAM BODY OF THE ANCHOR WORK (54,500 Kilograms)

• KUZEY MARMARA HIGHWAY, DILATOMETER  TEST MEASUREMENT (2,500 meters  core drilling and 45 pcs test measurement)

#4

• KAZAKHSTAN ALMATY, KASKELEN SULEYMAN DEMIREL UNIVERSITY, WATER WELL DRILLING PURPOSES STUDIES

Total Drill Quantity: 320 meters

 

• KAZAKHSTAN ALMATY, AKYAR STUDENT HOSTEL, WATER WELL DRILLING PURPOSES STUDIES

Total Drill Quantity: 400 meters

 

• KAZAKHSTAN ALMATY, TALGAR DAIRY PRODUCTS FACTORY, USING WATER WELL DRILLING STUDIES

Total Drill Quantity: 560 meters

 

• MANISA EROGLU DAM, RESERVOIR AREA IN THE REMAINING WATER WELL RE-OPENING STUDIES

Total Drill Quantity: 300 meters

• ARDAHAN POSOF,  WATER WELL STUDIES

Total Drill Quantity: 310 meters

bottom of page