Projects
#1
• SAKARYA DOGANCAY, REGULATOR AND HYDROELECTRIC POWER PLANT - II, GROUT IMPROVEMENT WORKS AND CONSTRUCTION GEOTECHNICAL GROUTING STUDIES
• SAKARYA DOGANCAY, REGULATOR AND HYDROELECTRIC POWER PLANT -I, GROUT IMPROVEMENT WORKS AND CONSTRUCTION GEOTECHNICAL GROUTING STUDIES
• AFYON SUHUT, SEHIT UZMAN CAVUS NURULLAH OYMAK DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES
• SIVAS SARKISLA KARACAOREN DAM, RIGHT COAST AND CUT – OFF GEOTECHNICAL GROUTING STUDIES
• SIVAS TUTMAC DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES
• SIVAS KARASAR DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES
• AFYON SANDIKLI KOCAGAZI DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES
• GIRESUN CALIKOBASI, REGULATOR AND HYDROELECTRIC POWER PLANT, GROUT IMPROVEMENT WORKS AND CONSTRUCTION GEOTECHNICAL GROUTING STUDIES
• KONYA MEDOVA HOSPITAL, GEOTECHNICAL GROUTING STUDIES
• ISTANBUL METRO, INSIDE TUNNEL UPPER FASE PST-M GROUT IMPROVEMENT STUDIES
• BALIKESIR BAYAT SEHIT AYDIN NAZILLIOGLU DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES
• BOLU YENICAGA CENTRAL MOSQUE , JET GROUTING STUDIES
• ANKARA BEYPAZARI GURSOGUT HEPP DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES
• MANISA DEMIRCI AYVAALANI DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES
• MERSIN TOROSLAR GOZNE DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES
• KUTAHYA SAPHANE DAM, CUT-OFF GROUTING STUDIES 2014
• SAKARYA GEYVE DEREKOY, UNDERPASS CONSOLIDATION GEOTECHNICAL GROUTING STUDIES
• KUTAHYA GEDIZ YAGMURLAR DAM, CUT-OFF GEOTECHNICAL GROUTING STUDIES
• AFYON IHSANİYE SARICAOVA DAM, CUT-OFF GEOTECHNICAL GROUTING STUDIES
• MANISA DEMIRCI AYVAALANI DAM, CUT-OFF CONSOLIDATION GEOTECHNICAL GROUTING STUDIES
• DENIZLI GUNEY KOPARAN DAM, INTAKE STRUCTURE ANCHOR GEOTECHNICAL GROUTING STUDIES
• SAMSUN 19 MAY DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES
• AYDIN KARACASU DAM, SPILLWAY GEOTECHNICAL GROUTING STUDIES
• AFGHANISTAN FAIZABAD DAM, GEOTECHNICAL GROUTING STUDIES
• KUZEY MARMARA HIGHWAY, INTER CONNECTION WAYS, INSIDE TUNNEL GEOTECHNICAL GROUTING STUDIES
• BALIKESIR BALYA KAYAPINAR DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES
• KONYA HUYUK ILMEN DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES
• NIGDE BOR HALAC DAM, CUT – OFF GEOTECHNICAL JET GROUTING STUDIES
• KARAMAN MERKEZ YILANGOMU DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES
• KUTAHYA GEDIZ YAGMURLAR DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES
• DENIZLI GUNEY KOPARAN DAM, CUT – OFF GEOTECHNICAL GROUTING STUDIES
#2
• ARTVIN DERINKOY HIZARLI , MINERAL EXPLORATION CORE DRILLS (GOLD)
Max Drill Height : 800 meters
1. Stage : Total Drill Quantity: 1,605 meters
2. Stage : Total Drill Quantity: 1,100 meters
• CANAKKALE BAYRAMIC, MINERAL EXPLORATION CORE DRILLS (GOLD)
Max Drill Height: 700 meters
Total Drill Quantity: 3030 meters
• SIIRT MADENKOY MINERAL EXPLORATION CORE DRILLS (COPPER)
Max Drill Height: 810 meters
Total Drill Quantity: 2,180 meters
• KASTAMONU HANONU, MINERAL EXPLORATION CORE DRILLS (COPPER)
Max Drill Height: 600 meters
Total Drill Quantity: 4,400 meters
• CANAKKALE BAYRAMIC, MINERAL EXPLORATION CORE DRILLS (GOLD)
Max Drill Height: 400 meters
Total Drill Quantity: 3,030 meters
• CANAKKALE BAYRAMIC PITIRELI, MINERAL EXPLORATION CORE DRILLS (ZINC)
Max Drill Height: 220 meters
Total Drill Quantity: 900 meters
• ADANA ALADAG, MINERAL EXPLORATION CORE DRILLS (CHROMIUM)
Max Drill Height: 200 meters
Total Drill Quantity: 1,500 meters
• CANAKKALE BIGA, MINERAL EXPLORATION CORE DRILLS (LEAD, COPPER, ZINC, SILVER)
Max Drill Height: 450 meters
Total Drill Quantity: 2,000 meters
• KUTAHYA TAVSANLI SAPCI, MINERAL EXPLORATION CORE DRILLS (COAL)
Max Drill Height : 405 meters
Total Drill Quantity : 2060 meters
• KÜTAHYA TAVSANLI SAPCI DEDE, MINERAL EXPLORATION CORE DRILLS (COAL)
Max Drill Height: 540 meters
Total Drill Quantity: 1100 meters
• BURDUR KARAMANLI, MINERAL EXPLORATION CORE DRILLS (MARBLE)
Max Drill Height: 60 meters
Total Drill Quantity: 400 meters
• MUGLA KOYCEGIZ-MENTESE, MINERAL EXPLORATION CORE DRILLS (CHROMIUM)
Max Drill Height: 350 meters
Total Drill Quantity: 5,000 meters
• BURSA ORHANELI, MINERAL EXPLORATION CORE DRILLS (CHROMIUM)
Max Drill Height: 280 meters
Total Drill Quantity: 3,500 meters
• GAZIANTEP NURDAGI, MINERAL EXPLORATION CORE DRILLS (CHROMIUM)
Max Drill Height: 200 meters
Total Drill Quantity: 3,500 meters
• MERSIN ERDEMLI, MINERAL EXPLORATION CORE DRILLS (CHROMIUM)
Max Drill Height: 110 meters
Total Drill Quantity: 1,500 meters
#3
• AFGHANISTAN FAIZABAD, REGULATOR AND HYDROELECTRIC POWER PLANT GEOTECHNICAL CONSULTING STUDIES
• CANKAYA KARATAS LOCATION, 1094 PARCELS COMPLETION OF CONSTRUCTION AND MUNICIPAL AFFAIRS OFFICE FACILITIES GEOTECHNICAL REPORTS STUDIES
• AYDIN KARACASU DAM, RAISING THE DAM BODY OF THE ANCHOR WORK (54,500 Kilograms)
• KUZEY MARMARA HIGHWAY, DILATOMETER TEST MEASUREMENT (2,500 meters core drilling and 45 pcs test measurement)
#4
• KAZAKHSTAN ALMATY, KASKELEN SULEYMAN DEMIREL UNIVERSITY, WATER WELL DRILLING PURPOSES STUDIES
Total Drill Quantity: 320 meters
• KAZAKHSTAN ALMATY, AKYAR STUDENT HOSTEL, WATER WELL DRILLING PURPOSES STUDIES
Total Drill Quantity: 400 meters
• KAZAKHSTAN ALMATY, TALGAR DAIRY PRODUCTS FACTORY, USING WATER WELL DRILLING STUDIES
Total Drill Quantity: 560 meters
• MANISA EROGLU DAM, RESERVOIR AREA IN THE REMAINING WATER WELL RE-OPENING STUDIES
Total Drill Quantity: 300 meters
• ARDAHAN POSOF, WATER WELL STUDIES
Total Drill Quantity: 310 meters